The Massachusetts Department of Public Health has informed town officials that West Nile Virus (WNV) has been detected in two collections of mosquitoes in Billerica…
Zero Waste Day is back! Billerica residents can bring appliances, white goods, powered lawn equipment, scrap metal and tires for free disposal on Saturday August…
Update 4/25/25 – MassDOT scheduled Overnight Pavement Milling on Boston Road, from Cook Street to Burlington High School. Work begins Sunday, April 27th at 6pm and…
Update – 6/23/25 – Monday, June 23rd and Tuesday, June 24th at 8pm, our contractor, PJ Albert, will be line striping Lexington Road, Manning Road,…
Update – 3/19/25 – We will be installing flow metering equipment throughout the Town’s sanitary sewer collection system as part of our 2025 Flow Monitoring…